SERVICES

DESIGN AND INSTALLATION

 

• Design and planning [ 2 hour planning service free ]• Landscape Planning and building
• Remodel and building• Stone and tile paths and walls
• Wood restoration• Landscape lighting
• Energy efficient LED lighting• Steep slope building techniques
• Electrical• Custom shotcrete retaining walls
• Plumbing• Trellis, Arbors and spas
• Building• Remodeling
• Landscape building and retaining walls• Design And planning
• Drywall• Lighting
• Tiling, Installation and Design• Cabinetry ; Kitchen and bath cabinetry
• Foundation

Our service and introduction ; 2 hours free design, planning and engineering consultation

 

Estimates are free
Marin Restorations Home Restoration Professionals

INTERIOR: Design, engineering, fabrication and restoration

• Remodeling to suit your homes era and style
• Electric and plumbing, Lighting [ led ]
• Painting and touch up EXTERIOR: Design, fabrication and restoration, Roof repairs of all types, gutter and downspout

kitchen

San Rafael, Eichler ; kitchen and family

• Trim installation and repairs
• Shingle and siding repairs and replacement
• Shingle and siding pressure washing and staining
• Exterior water seal, prime and paint
• Exterior rot repairs
• Decking and retaining walls
• Drainage
• Lighting and electric


Home projects to view in your neighborhood. Save me for your reference. David Mason; 415-297-1489 masonrestoration@yahoo.com

Mill Valley; cantilevered deck

cantilevered deck mill valley

Greenbrae; custom spa

custom spa mill valley

 


Marin Home Restoration

 

 


Dave Mason, Principal 60 Lovejoy Way Novato, CA 94949 415.297.1489
masonrestoration@yahoo.com
License Number: 715338

Sample Estimate
Project: Deck Restoration 805 Denise Court, Mill Valley, California 94941

Demo existing upper and lower decks :2 days, 3 men
Lower deck: 20′ / 45′
Upper deck: 12′ / 12′
Stairs: 40′ / 3′
Saved decking: two-thirds of decking
Plane deck boards, remove nails1 day
Replace all framing with flashed Pt fir, reshape deck, and stairs 3 days
Move spa re frame
Install spa on lower level, install foundation and electric
Install new stairway1 day
Widen existing stairs with landing1 day
Screw down deck boards3 days
Install railings2 days
Stain structure with messmers1 day
Dump and debris1 day
Tool in and tool out1 day
Total project time18 days
Materials:
Dump and planer =
Estimate only: 200 feet of b grade 2/6 =
Frame wood =
Redwood for railings =
Flashing =
Stain =
Nails and screws =
Foundation and electric =
Total materials =
Total bid =

View Marin Restorations Home Restoration Professionals Pdf File View Marin Restorations Pdf File