DESIGN AND INSTALLATION
• Design and planning [ 2 hour planning service free ] | • Landscape Planning and building |
• Remodel and building | • Stone and tile paths and walls |
• Wood restoration | • Landscape lighting |
• Energy efficient LED lighting | • Steep slope building techniques |
• Electrical | • Custom shotcrete retaining walls |
• Plumbing | • Trellis, Arbors and spas |
• Building | • Remodeling |
• Landscape building and retaining walls | • Design And planning |
• Drywall | • Lighting |
• Tiling, Installation and Design | • Cabinetry ; Kitchen and bath cabinetry |
• Foundation |
Our service and introduction ; 2 hours free design, planning and engineering consultation
Estimates are free
Marin Restorations Home Restoration Professionals
INTERIOR: Design, engineering, fabrication and restoration
• Remodeling to suit your homes era and style
• Electric and plumbing, Lighting [ led ]
• Painting and touch up EXTERIOR: Design, fabrication and restoration, Roof repairs of all types, gutter and downspout
San Rafael, Eichler ; kitchen and family
• Trim installation and repairs
• Shingle and siding repairs and replacement
• Shingle and siding pressure washing and staining
• Exterior water seal, prime and paint
• Exterior rot repairs
• Decking and retaining walls
• Drainage
• Lighting and electric
Home projects to view in your neighborhood. Save me for your reference. David Mason; 415-297-1489 masonrestoration@yahoo.com
Mill Valley; cantilevered deck
Greenbrae; custom spa
Marin Home Restoration
Dave Mason, Principal 60 Lovejoy Way Novato, CA 94949 415.297.1489
masonrestoration@yahoo.com
License Number: 715338
Sample Estimate
Project: Deck Restoration 805 Denise Court, Mill Valley, California 94941
Demo existing upper and lower decks : | 2 days, 3 men |
Lower deck: 20′ / 45′ Upper deck: 12′ / 12′ Stairs: 40′ / 3′ Saved decking: two-thirds of decking |
|
Plane deck boards, remove nails | 1 day |
Replace all framing with flashed Pt fir, reshape deck, and stairs | 3 days |
Move spa re frame | |
Install spa on lower level, install foundation and electric | |
Install new stairway | 1 day |
Widen existing stairs with landing | 1 day |
Screw down deck boards | 3 days |
Install railings | 2 days |
Stain structure with messmers | 1 day |
Dump and debris | 1 day |
Tool in and tool out | 1 day |
Total project time | 18 days |
Materials: | |
Dump and planer = | |
Estimate only: 200 feet of b grade 2/6 = | |
Frame wood = | |
Redwood for railings = |
Flashing = |
Stain = |
Nails and screws = |
Foundation and electric = |
Total materials = |
Total bid = |