SERVICES

DESIGN AND INSTALLATION

 

• Design and planning [ 2 hour planning service free ] • Landscape Planning and building
• Remodel and building • Stone and tile paths and walls
• Wood restoration • Landscape lighting
• Energy efficient LED lighting • Steep slope building techniques
• Electrical • Custom shotcrete retaining walls
• Plumbing • Trellis, Arbors and spas
• Building • Remodeling
• Landscape building and retaining walls • Design And planning
• Drywall • Lighting
• Tiling, Installation and Design • Cabinetry ; Kitchen and bath cabinetry
• Foundation

Our service and introduction ; 2 hours free design, planning and engineering consultation

 

Estimates are free
Marin Restorations Home Restoration Professionals

INTERIOR: Design, engineering, fabrication and restoration

• Remodeling to suit your homes era and style
• Electric and plumbing, Lighting [ led ]
• Painting and touch up EXTERIOR: Design, fabrication and restoration, Roof repairs of all types, gutter and downspout

kitchen

San Rafael, Eichler ; kitchen and family

• Trim installation and repairs
• Shingle and siding repairs and replacement
• Shingle and siding pressure washing and staining
• Exterior water seal, prime and paint
• Exterior rot repairs
• Decking and retaining walls
• Drainage
• Lighting and electric


Home projects to view in your neighborhood. Save me for your reference. David Mason; 415-297-1489 masonrestoration@yahoo.com

Mill Valley; cantilevered deck

cantilevered deck mill valley

Greenbrae; custom spa

custom spa mill valley

 


Marin Home Restoration

 

 


Dave Mason, Principal 60 Lovejoy Way Novato, CA 94949 415.297.1489
masonrestoration@yahoo.com
License Number: 715338

Sample Estimate
Project: Deck Restoration 805 Denise Court, Mill Valley, California 94941

Demo existing upper and lower decks : 2 days, 3 men
Lower deck: 20′ / 45′
Upper deck: 12′ / 12′
Stairs: 40′ / 3′
Saved decking: two-thirds of decking
Plane deck boards, remove nails 1 day
Replace all framing with flashed Pt fir, reshape deck, and stairs  3 days
Move spa re frame
Install spa on lower level, install foundation and electric
Install new stairway 1 day
Widen existing stairs with landing 1 day
Screw down deck boards 3 days
Install railings 2 days
Stain structure with messmers 1 day
Dump and debris 1 day
Tool in and tool out 1 day
Total project time 18 days
Materials:
Dump and planer =
Estimate only: 200 feet of b grade 2/6 =
Frame wood =
Redwood for railings =
Flashing =
Stain =
Nails and screws =
Foundation and electric =
Total materials =
Total bid =