DESIGN AND INSTALLATION
| • Design and planning [ 2 hour planning service free ] | • Landscape Planning and building |
| • Remodel and building | • Stone and tile paths and walls |
| • Wood restoration | • Landscape lighting |
| • Energy efficient LED lighting | • Steep slope building techniques |
| • Electrical | • Custom shotcrete retaining walls |
| • Plumbing | • Trellis, Arbors and spas |
| • Building | • Remodeling |
| • Landscape building and retaining walls | • Design And planning |
| • Drywall | • Lighting |
| • Tiling, Installation and Design | • Cabinetry ; Kitchen and bath cabinetry |
| • Foundation |
Our service and introduction ; 2 hours free design, planning and engineering consultation
Estimates are free
Marin Restorations Home Restoration Professionals
INTERIOR: Design, engineering, fabrication and restoration
• Remodeling to suit your homes era and style
• Electric and plumbing, Lighting [ led ]
• Painting and touch up EXTERIOR: Design, fabrication and restoration, Roof repairs of all types, gutter and downspout
San Rafael, Eichler ; kitchen and family
• Trim installation and repairs
• Shingle and siding repairs and replacement
• Shingle and siding pressure washing and staining
• Exterior water seal, prime and paint
• Exterior rot repairs
• Decking and retaining walls
• Drainage
• Lighting and electric
Home projects to view in your neighborhood. Save me for your reference. David Mason; 415-297-1489 masonrestoration@yahoo.com
Mill Valley; cantilevered deck

Greenbrae; custom spa

Marin Home Restoration

Dave Mason, Principal 60 Lovejoy Way Novato, CA 94949 415.297.1489
masonrestoration@yahoo.com
License Number: 715338
Sample Estimate
Project: Deck Restoration 805 Denise Court, Mill Valley, California 94941
| Demo existing upper and lower decks : | 2 days, 3 men |
| Lower deck: 20′ / 45′ Upper deck: 12′ / 12′ Stairs: 40′ / 3′ Saved decking: two-thirds of decking |
|
| Plane deck boards, remove nails | 1 day |
| Replace all framing with flashed Pt fir, reshape deck, and stairs | 3 days |
| Move spa re frame | |
| Install spa on lower level, install foundation and electric | |
| Install new stairway | 1 day |
| Widen existing stairs with landing | 1 day |
| Screw down deck boards | 3 days |
| Install railings | 2 days |
| Stain structure with messmers | 1 day |
| Dump and debris | 1 day |
| Tool in and tool out | 1 day |
| Total project time | 18 days |
| Materials: | |
| Dump and planer = | |
| Estimate only: 200 feet of b grade 2/6 = | |
| Frame wood = | |
| Redwood for railings = |
| Flashing = |
| Stain = |
| Nails and screws = |
| Foundation and electric = |
| Total materials = |
| Total bid = |